- All bin surfaces are smooth to provide excellent material flow characteristics
- Bin walls are provided as factory preassembled panels that are up to 25-feet high to significantly reduce field assembly time
- Almost the entire bin system is assembled using high strength fasteners
- To protect against damage to the protective coatings on galvanized or aluminized steel, no welding is used to manufacture the walls
- Welding is only used in the roof area to provide superior protection against water penetration
- Interior wall spaces are ventilated to help prevent the buildup of dust and moisture which can cause corrosion — It also permits effective fumigation if ever required
- A highly refined hopper to wall connection using mechanical fasteners eliminates field fitting and welding in this area — This greatly reduces assembly time and preserves the protective coatings on the steel
- Field assembly time is also substantially reduced by the use of blind fasteners mounted into plain holes — This eliminates the requirement to have two people installing bolts and the problems associated with thread damage to threaded connections
Company
Abel has over 50 years of extensive experience in feed production, grain handling, seed processing, fertilizer, plastics, aggregates, and any other type of bulk material.
Learn More
To request more information please fill out the form below. A Feed and Grain team member will help connect you with the right representative at亚伯LLC.